2.22.0

  • Add of risks management.
  • Add of issues management.
  • Internationalization of setup.
  • English default.pdb file.

2.21.0

  • Add of a "today" screen, as a todo list.
  • Menu changes.
  • Optimisation of planning.
  • Planning display as a Gantt.
  • Installation file reduced in size.

2.20.1

  • Import of interventions from excel file.
  • Respect sort order in editions.

2.20.0

  • Management of actions.
  • Add hints on every button.
  • Resizing of the detail part of the components screen.
  • Display components list as a grid.
  • Correction of the impossibility to deactivate an intervention with comments.

2.19.0

  • Resizing of the detail part of the intervention screen.
  • Add of the description of intervention on the "Components" tab of the intervention screen.
  • Display of intervention list as a grid (delete of parameter).
  • Add of a button to display / hide the menu of application.
  • Add management of comments on interventions.

2.18.0

  • Update of reports and logo to spread deployment of DeltaProd.
  • Correction of a bug on type change on intervention screen.


2.17.2

  • Correction of infinite loop if separator field is " _ " (underscore).
  • Deleting message appearing on Reports under Windows 2000.


2.17.1

  • Correction of workload adding when adding an activity.


2.17.0

  • Input and display of seconds on status dates, to identify two status very near in time.
  • Correction of workload screen displaying nothing after save if only one intervention is displayed.
  • Correction of workload screen to display tasks in the correct order for one intervention.


2.16.1

  • Ergonomic improvement on assignation and workload screens.
  • Upgrade input stability on assignation and workload screens.
  • Correction of update of "Version" and "Domain" depending on "Application" on intervention screen


2.16.0

  • Display upgrade of workload screen for dynamic affectation mini-screen.
  • Add a planning type = "NO" (no planning)
  • Upgrade of planning calculation
  • Export of planning to MS-Project format
  • On workload screen, selection of a line did not refresh dynamic affectation mini-screen data.
  • Correction on very first planning that freezes.
  • Change of status of interventions from upper or lower intervention does not change any more the status of closed interventions.
  • Input and display of dates takes into account the format defined in Windows regional parameters.


2.15.0

  • Automatic switch depending on decimal point ("." or ",").
  • Possibility to set to zero the remaining workload when closing an intervention.
  • Correction of saving errors for dates on quality insurance sheets.


2.14.1

  • Correction of problems of saving when decimal point is not ".".
  • Correction of updating of remaining workload when decimal point is not ".".
  • Possibility to add parameters on a select clause of a request of a report.


2.14.0

  • Add of a parameter to set up the order of status to take into account when calculating the actual status.
  • Correction of calculation of indicators while subtracting waiting periods if the status before the wait status starts at the same date.
  • Correction of mail addresses when sending to several addressees.
  • Correction of blocking of project selecting after cancelling a printing.


2.13.0

  • Display list of interventions as a grid (evaluation version)
  • Planning of tasks (evaluation version, no document)
  • Correction of calculation of indicators to subtract waiting periods.
  • Correction of global calculation of indicators for multi projects files. Only current project indicators are updated.
  • Correction of possibility to enter " character in description and treatment of an intervention.
  • Correction of mail sending, to process only mails for the selected project.
  • Display of dates in long format on automatic mails.


2.12.0

  • When versioning, do not display errors on linked interventions.
  • Add field "Cellular" and "Comments" on users screen.
  • Ajout du libellé de l'intervention sur les assignations et les imputations.
  • Possibility to select interventions for a domain.
  • Correction of return, from requestor, to report requests, when they contain interlinked requests.
  • Correction of indicator "% correction" for it to be calculated whatever the main category of imputation of correction linked to the intervention and not only to the same main category.


2.11.0

  • Possibility to change orientation of reports (portrait / landscape).
  • Quality insurance sheets management.
  • Hide workloads for "customer" users.


2.10.0

  • Possibility to save RTF reports as RTF, DOS text or UNIX text.
  • Possibility to print and to save in clipboard the result of a request in the requestor.
  • Correction des conditions d'envoi de mails.
  • ON report preview, direct focus on document to be able to scroll page.
  • Change display format of mails lists.
  • Correction of requestor to allows "Read only" users to execute Select requests.
  • Correction of abort when a problem occurs on adding a linked file.
  • Correction of global update of indicators, which deleted interventions with no status.


2.9.0

  • Automatic mail sending.
  • Change of format for word reports.
  • Possibility to enter workload over 1 day per day.
  • Parametering of number of decimal on workloads.
  • Add linked files to interventions, chronos and components.
  • Resolution of problem of positioning on a new intervention, when linked components are added before saving.
  • New message when selected element disappears from the list and is not selected any more.


2.8.3

  • Correction of display of indicators calculated on opened days.
  • Display of clear value of delay on intervention screen.
  • Actualization of status of reports from a new reference.
  • Multuple replacement of data in header of reports.
  • Correction of return from requestor to report screen.
  • Positioning on correct tab when a field is in error.


2.8.2

  • Correction of error that prevented to create a new status is not inserted by default.


2.8.1

  • Selectable invisible field on main screen disabled.
  • Deactivation of selection of intervention on a grid.
  • Access to requestor corrected for non administrators.


2.8.0

  • Change of indicator management (see online help)
  • Possibility to manage "Milestone" status.
  • Possibility to enter waiting periods
  • Possibility to have several times the same status for an intervention.
  • Possibility to select the project from the main screen.


2.7.2

  • Allow to change application on copy of intervention.


2.7.1

  • Correction of workload input for week between two years.


2.7.0

  • Possibility to change text data in a mini editor, reachable through [F3] key.
  • Repairing of a damaged file on opening.
  • Possibility to compact data file.
  • Disable access to workload for a closed intervention.
  • Correction of search by external reference on components selection.


2.6.2

  • Insertion of a new status is by default saved at actual date.
  • Sum for an intervention of the workload screen is displayed even when editing data for another user.


2.6.1

  • Inserting Chrono reference can access to the Chrono if the field is not empty.
  • Correction of access to specific personal reports.
  • Re-activation of initialization on insertion.
  • Prohibit insertion of a status of a new intervention until changes are first saved.


2.6.0

  • Improvement of delay indicators calculation if one of the key dates has no hour.
  • Management of a contractual package reference, default value is defined for each category and for each project, value modifiable for each intervention.
  • Add contract reference on project.
  • Management of reports and editions to manage personal reports.
  • Correction of calculation of "Delivery late" indicator, which was not using the correct date.
  • Correction of application abort on [F12] key when application menu is displayed.
  • Correction of access to assignations for closed interventions.
  • Deactivation of all tasks when the intervention is deactivated.


2.5.0

  • Real move of component files when updating version.
  • Complete online Help (in French).


2.4.1

  • Correction of an incorrect control on "Assign all" of the workload screen.
  • Correction of the update into lists.


2.4.0

  • Physical links to components for file access.


2.3.1

  • Possibility to insert a Chrono reference.
  • Correction of calculation of Quality indicators.


2.3.0

  • Possibility to enter some ' characters in fields.
  • Possibility to change the status of all the interventions linked to one intervention.
  • Add the external reference on list of interventions.
  • Possibility to open several Chronos screens.
  • Selection of display mode for Chronos screen.
  • Selection of display mode for Component screen.


2.2.2

  • Automatic insertion of default data.


2.2.1

  • Add of "EMI" main status, to update "sent" date.
  • Correction de l'affichage de la date d'état actuel.


2.2.0

  • Possibility to Export/Import data of an intervention.


2.1.1

  • Corrections on the workload screen.


2.1.0

  • Ergonomics and performance improvement on the workload screen.


2.0.1

  • Correction of the sum on the workload screen.


2.0.0

  • Screen ergonomics improvement (possibility to change size of windows, adding of buttons).
  • Tasks management, Assignment management, workload management.
  • Chronos management (mails, ...).
  • Change of the extension of the data file (.pdb).
  • Parameters management screen.
  • Possibility to publish report in HTML.


1.0.2

  • Origin environment is not mandatory any more if some components of the intervention have changed version yet.
  • Loading directory for reports is automatically created if not existing.
  • Caption size is adapted to the field size.


1.0.1

  • Password is not visible any more.
  • Modal windows don't freeze any more after switching to another program.


1.0.0

  • First version including only configuration management.